May 2026: siding
and exterior finish.

Currently: siding and exterior finish
May 2026 Phase 4 · siding & exterior

The black A-frame emerges

This month the cabin really took shape. The deep matte-black board-and-batten and standing-seam metal panels are going up fast, and you can finally see the silhouette we've been chasing. Construction is moving quickly: windows are getting their final seals, the dormers are wrapped, and the Scandinavian exterior is reading exactly the way we hoped. Next up: the last sections of trim and shifting focus back inside.

Front A-frame with siding underway Dormers wrapped in dark siding Side profile in standing-seam metal Window install in progress Board-and-batten close-up Wide shot of the cabin nearing exterior completion
Board-and-batten Standing seam metal Window install Exterior finish
March 2026 Phase 3 · drywall complete

Drywall is done

The walls are up and the interior is starting to feel like a real home. With the drywall finished, every room finally has its defined edges. You can walk through and imagine exactly where the couch sits, where the bed goes, and how the light will hit the great room in the morning. Next up: paint, trim, and the finish work that brings it all together.

Drywall installed, room view 1 Drywall installed, room view 2 Drywall installed, room view 3
Drywall Interior finish Ready for paint
March 2026 Phase 2 · interior framing

Inside the frame

Interior framing is underway. The bones of every room are taking shape. Standing inside the cabin for the first time you feel just how dramatic that soaring ceiling is going to be. Electrical rough-in and insulation are next on deck.

Interior framing Window wall framing
Interior framing Windows Electrical rough-in
February 2026 Phase 1 · structure & roof

The A-frame rises

The full A-frame is up against a clear Shenandoah sky. The dark steel roof is complete, the deck platform is framed, and the triangular window wall is in place. Seeing it from a distance with the Blue Ridge behind it: this is exactly what we pictured.

Full A-frame front view A-frame with mountain backdrop Side view with mountains
Steel roof Full structure Deck framing Windows in
December 2025 Phase 0 · the land

It all started here

Before there was a single nail or beam, there was this view. Rolling meadows, ancient oaks, and the Blue Ridge mountains stretching to the horizon. We knew this was the spot the moment we stood here in the fall. HOM Villas was born on this hillside in Luray, Virginia.

The Shenandoah Valley property
The land Shenandoah Valley Where it began
Late spring 2026 Coming next

Paint, trim, and finish work

Walls go from drywall to color. Trim runs. Doors hang. The interior starts to feel less like a job site and more like a place you'd live in.

Upcoming milestone
Early summer 2026 Coming next

Interior fit-out and hot tub

Kitchen install, bathroom finishes, furniture in. The deck builds out and the hot tub goes in facing the ridge.

Upcoming milestone
Summer 2026 First key

Doors open

HOM Villas cabin one welcomes its first guests. Get on the list now and we'll let you pick your weekend before bookings go public.

Get on the list
Follow the build on Instagram @homvillas